Free Shipping on orders over 2000 ₹ !
Free shipping on orders over 2000 ₹ !
Need Help? +91 76781 14539
Shopping Cart
Cart Item
0
Shopping Cart 0

Shopping Cart

Your cart is empty

Top Rated Products

Teenager Bra Women's Cotton Non Padded Wired Regular, Full-Coverage Bra (Teenager 38DD WBS_White, Black, Skin_38)

No reviews yet
₹160.00 ₹180.00 11% OFF
Material composition Cotton Style Casual Underwire type Wire Free Pad type Non-padded Care instructions Hand Wash Only Closure type Hook And Loop Country of Origin India
In Stock (100 available)
Categories: Innerwear, Women
Weight: 0.20 kg
Everyday Wear: These bras are designed for everyday use, providing comfort, support, and coverage throughout the day. Underneath Clothing: The bras can be worn under various types of clothing, including tops, dresses, or blouses, for a smooth and seamless look. Versatile Outfits: The pack includes multiple bras, making them suitable for different outfits, occasions, or personal preferences. Comfort: The cotton material offers a soft and comfortable feel against the skin, making it suitable for all-day wear. Support: The wired design and full-coverage style provide enhanced support and shaping for the breasts, ensuring a flattering silhouette. Natural Shape: The non-padded cups allow for a more natural shape, providing a subtle and comfortable fit. Versatility: The pack of 3 bras gives you multiple options to choose from, allowing you to rotate and wear different colors or styles according to your preference. Durability: The bras are made from durable cotton material, ensuring long-lasting quality and performance
Weight 0.20 kg
SKU N/A
Customer Reviews
No reviews yet. Be the first to review this product!
Write a Review